In partnership with the Department of Recreation and Parks and the Department of Public Works, LADWP has developed an innovative Stormwater Capture Parks Program to collect rainwater and urban runoff at nine local parks in the East San Fernando Valley. These stormwater capture projects will help replenish the San Fernando Groundwater Basin, improve water quality in the Los Angeles River, reduce local flooding, and provide recreational and environmental benefits to the community through related park improvements.
Neighborhood stormwater capture projects are an important part of helping LADWP increase the City’s local water supplies and reduce its dependence on more expensive, imported purchased water from the Metropolitan Water District of Southern California (MWD). Collectively, these projects are expected to capture nearly 949 million gallons annually— contributing to more than doubling the average stormwater captured from about 21 billion gallons annually to more than 49 billion gallons annually by 2035.
Project Sites
The nine parks selected for this program provide ideal locations for stormwater projects because they offer the space to capture and infiltrate stormwater, and are conveniently located directly above the San Fernando Groundwater Basin.
North Hollywood
Alexandria Park
North Hollywood Park
Strathern Park North
Valley Plaza Park North
Valley Plaza Park South
Valley Village Park
Whitsett Fields Park
Sun Valley
Fernangeles Park
Pacoima
David M. Gonzales Recreation Center
Community and Environmental Benefits
Each stormwater capture project includes park upgrades and some may include additional recreational features.
In addition to the water supply and recreational benefits, stormwater capture projects also reduce local pollutants such as trash, metals and bacteria that enter the Tujunga Wash, Los Angeles River and the ocean.
Program Schedule
| Program Design | December 2019 – July 2024 |
| Environmental Review | September 2019 – September 2021 |
| Public Outreach | January 2020 – Project Completion |
| Construction Bid/Award | September 2025 – December 2026 |
| Estimated Construction |
May 2026 – April 2028 August 2026 – June 2028 June 2026 – May 2028 June 2026 – May 2028 July 2026 - June 2028 January 2027 – December 2028 TBD |
Environmental Documentation
Following guidelines outlined in the California Environmental Quality Act (CEQA), LADWP prepared an Initial Study/Mitigated Negative Declaration to analyze the potential environmental impacts of the project. A copy of the environmental documents can be found at: www.ladwp.com/envnotices.
Contact Us
| LADWP Community Liaison | Sandra Robles | 213-367-1309 | [email protected] |